Back to All Events

Aras Innovator Demo Series: Systems Engineering with Aras MBSE Integration

MBSE Implementation Challenges

  • Requirements continually evolving during design process
  • Managing MBSE model versions and revisions (change)
  • Linking Simulation models to MBSE models for V&V
  • Linking Test results to MBSE models for V&V
  • Linking discipline-specific Design models to MBSE models for V&V
  • Managing model lifecycles, approval and change processes, access

Benefits of MBSE Integration

  • Persistent administration in an extended PLM and/or ALM System for MBSE artifacts

  • Integration of MBSE into the enterprise ECM (Engineering Change Management) and CM (Configuration Management) processes
  • Managed access control
  • Visualization of the MBSE artifacts
  • Data exchange in the early phase based on standard